Background of The Project

Dhaka Metropolitan city has now been turned into the busiest densely populated city. Large number of people reside permanently in Dhaka city for service, business and other purposes. The dwelling places required for these large number of people are very inadequate. As a result, the residential areas of Dhaka city are getting overcrowded and dirty day by day and creating unhealthy environment causing damage to the beauty of city. All these are because of mainly unplanned urbanization. It is possible to reduce the pressure of population of Dhaka is a great extent by developing Flats/Apartments as a permanent resident. Focusing the need of housing for lower and middle income group of people, government has decided to establish planned housing by constructing multi-storied building. This Project has been accepted categorically by ECNEC under Uttara (3rd Phase) Project, RAJUK on 25th April, 2000. In line with the categorical acceptance a DPP for Construction of around 22000 apartments for middle and lower income group of people at sector-18, Uttara, Dhaka has been recommended at inter-ministerial meeting at ministry of Housing and Public Works on 28th February, 2010 (presided by the Secretary, MOH&PW). Hon�ble Prime Minister has laid Foundation Stone of the Project on 21st April, 2010. DPP of the Project has been approved on 10th October, 2011. Project Duration: Nov/2011 to June/2016. It is the ever largest Planned Apartment Project in the country having 214.44 acres of land at Uttara (3rd Phrase) Project, Sector-18, Uttara, Dhaka for Low and Middle Income group of people. Approximately 240 nos. 16 storied Apartment Building including one basement floor comprising about 20,160 nos flats were supposed to be constructed. The statistics of Building and flats as per approved DPP are as follows:
Type Net Area Nos. of Building Unit Per floor Total Flats Parking (Approx.)
Block 'A'
1250sft
79
6 nos
6636
100%
Block 'B'
1050sft
86
6 nos
7224
60%
Block 'C'
850sft
75
6 nos
6300
60%
Total
 
240 nos
 
20,160
 
Location of the Project:
'Uttara Apartment Project' is situated at sector 18 of Uttara (3rd Phrase) Project covering Block 'A', 'B' & 'C'. The main approach will be from Ashulia Flood Protection Embankment Road and Sonargaon Jonopath of Uttara Model Town. Proposed MRT will have the possibility through the Project area.
Project Cost:
Taka 903071.87 lacs
Project Facilities:
Building coverage area is 45% of the project area and rest 55% area is open.There are one Primary school, one High school, one Mosque, one Community center and Neighborhood shops in every block. There are play grounds for children of the community in each block as well as green space. Sewerage treatment plant (STP) is also provided in the underground for beautification of the project.
1st Revision of the project:
For some land constrained at site the Master Plan (Layout Plan) of the project is required to revise. Then Revised Layout Plan of Block �A� Uttara Apartment Project has been prepared by Department of Architecture (DOA). It has become remarkable changes in the number of buildings and their locations as well as number of flats. The statistics are as follows:
Type Net Area Nos. of Building Unit Per floor Total Flats
Block 'A'
1250sft
79
6 nos
6636
Block 'B'
1050sft
72
6 nos
6048
Block 'C'
850sft
72
6 nos
6608
Total
 
223
 
18,732
2nd Revision of the project:
The master plan of Block-A may require to be revised keeping the building places and numbers unchanged because of possibility of increasing land area. Besides this, construction of net 1250 sft flat at at Block-B and net 1050 sft flat at Block-C instead of 1050 sft and 850 sft flat respectively may be implemented. It has not been finalized yet, but still it is under consideration. If it is so, then the numbers of flats at Block-B and Block-C will be again changed. Approximate statistics are as follows:
Type Net Area Gross Area Nos. of Building Unit Per floor Total Flats
Block 'A'
1275 sft
1654 sft
79
6 nos
6636
Block 'B'
1250 sft
As per design
52
6 nos
4368
Block 'C'
1050sft
As per design
48
6 nos
4032
Total
 
 
 
 
 
Development:
There are plans to build 15,036 nos flat in 179 nos 16-storied building of different sizes. Construction work of 1275 sqft net area flats is ongoing in 'A' Block of this Project. Among of 79 nos building 67 nos building construction work is going on full swing in the field level. In the meantime R.C.C framework of 10 nos 16-storied building (including one basement) has been finished and brick-wall, plaster work, grill and door frames fittings including finishing items work is going. More than 4,000 nos flats of 1275 sqft net area in 'A' Block have already been given allotment to different categories of people. Now application in prescribed Form for the allotment of rest 2500 flats (Type-'A' net 1275 sqft.) are receiving. Application will be received upto 31st January, 2016. Honorable Minister, Ministry of Housing and Public Works Engineer Mosharrof Hossain has declared that flats will be started handed over among the allotees by next December/ 2016. Necessary steps are being taken to comply with this commitment. On the other hand, construction work of 8,400 nos flat in 100 nos 16-storied building in Block-B and Block-C of this project is almost in final stage on G to G basis with Government of Malaysia through Commercial and Technical management.